Placement Requests - Placement Summary Screen
Placing & Receiving Agency Related Guide (PARG RARG){{@5}}
Summary:The Placement Summary screen provides different views to support capacity and utilization management of individual and group placements. For instructor-led Groups, a special mode for "Group overlaps" allows programs to review and resolve scheduling conflicts.
New Icons:
Group Shift Schedule
Individual Shift Schedule
Shift Schedule - Shift Changes Exist
Scheduling conflict exists (Groups)
BackgroundThe Placement Summary screen provides a shared worksheet for individual and collaborative processes to review unit availability, to resolve scheduling overlaps for groups, and to distribute placements equitably. The Placement Summary screen has two modes: for instructor-led Groups and for Individual placements.
Instructor-led groups present unique scheduling challenges. In some jurisdictions (such as a city or region), Placing Agencies may create scheduling conflicts when two or more instructor-led Groups are requested for the same shift on a unit. The Placement Summary screen provides three different views for managing group capacity and utilization with an Agency or region:
Group overlaps may be resolved through processes such as:
In order for group overlaps to be flagged automatically by HSPnet, all participating schools must be setup under Maintenance → Setup/Lookup → Programs to use the NIS Tools module and to Automatically Flag Conflicts. This setup change must be performed by HSPnet Support, and first requires planning among all schools in a jurisdiction on how they will use automated conflict flagging.
Access the Placement Summary screen: (Placing Coordinator)
On the left navigation bar, click: Worksheets to open the options under that link, and select PR Summary.
Access the Placement Summary screen: (Receiving Coordinator)
Click: PR Summary on the left navigation bar.
Using the Placement Summary screen
The Current View filter provides several useful filter options:
Mode 1: All destinations – by Site
This view lists all destinations for one site only, with the number of active requests at the selected site:
Click the Shift Schedule icon or to view a detailed schedule for the destination, including group overlaps (displayed in red) – see the Knowledge Base Guide entitled Group Shift Schedule for detailed instructions on this feature.
In the adjacent example, unit MHComHME has no icons because there are zero requests at that destination in the service of Administration.
Mode 3: Group Overlaps only (available when filtered to "Groups only")
This view focuses on destinations that have two or more groups with scheduling overlaps as identified with a conflict flag that is automatically set by HSPnet (requires setup of NIS tools as explained on page 1). Once all scheduling conflicts are resolved (e.g. by alternating day and evening shifts) the destination is no longer displayed in this mode.
= Low Utilization.= Medium Utilization = High Utilization
There is another tool called Capacity Utilization that enables you to view how much activity there is on a single destination. To view the guide, please click option 8: Capacity Utilization tool, in the contents of the destination profile guide.